On November 12th, the Instrument Wind Buffer Tank V-76002 of Oman Liwa Plastic Project was successfully lifted in position.
This equipment is the first large equipment to be lifted by the Oman project, and the successful lifting marks the installation of the Oman project equipment into a new milestone.